Assetz City of Palms Masterplan

The Assetz City of Palms layout sets 620 plots across 35.16 acres of coconut and mango plantation on Chapparakallu Road, between the STRR and IVC Road in Devanahalli taluk. It is a BIAAPA-approved plan with a clear structure: a 15 m spine road across the middle, 12 m and 9 m roads between the plot rows, four parks, and a green spine that follows a natural drain through the eastern half of the land. With a civic amenity site, a clubhouse plot on the Chapparakallu Road side and services laid underground to every plot, it is a gated community of plots in North Bangalore planned as a neighbourhood, not a grid of sites. Assetz Miru & Miyo is useful for the site-planning lens because buyers should read open space, movement, parking, and amenity placement as everyday-use details, not brochure decoration.

Registered with K-RERA on 30 June 2026 under PRM/KA/RERA/1250/303/PR/300626/008780, the layout is due for completion, with possession of the plots, by 15 February 2029. The clubhouse follows by 15 May 2030.

Assetz City of Palms sanctioned draft residential layout plan filed with K-RERA, 620 plots on 35.16 acres
The sanctioned draft layout plan - Assetz City of Palms

Assetz City of Palms Layout at a Glance

ElementDetail
Land35.16 acres (142,270 sq m), Doddacheemanahalli village, Kundana hobli, Devanahalli taluk
Plots620: 619 residential and 1 commercial, the clubhouse plot
Density17.6 plots per acre
Roads15 m spine road; 12 m and 9 m internal roads; 3 m and 1.2 m pedestrian pathways
ParksFour, 14,871 sq m in all (~3.7 acres)
Civic amenity siteOne, 7,133 sq m (~1.8 acres)
Open land45.1% of the land: roads, parks and the civic amenity site
FrontageAbout 0.44 km on the 22 m Chapparakallu Road, along the west boundary
Clubhouse~20,000 sq ft, on a commercial plot of ~21,300 sq ft
Sewage treatment450 KLD STP at the south end of Park-4
Layout approvalBIAAPA draft residential layout plan, approved 19 June 2026
K-RERAPRM/KA/RERA/1250/303/PR/300626/008780, registered 30 June 2026
CompletionLayout and plot possession by 15 February 2029; clubhouse by 15 May 2030

The Assetz City of Palms Land-Use Split

Just over half of Assetz City of Palms becomes plots. The other 45.1%, 64,216 sq m or 15 acres 34.73 guntas, stays open as roads, four parks and a civic amenity site. It is earmarked in the approved plan and relinquished to the local authority on completion, so no plot can ever be carved out of it.

UseAreaShare of land
Plots (619 residential + 1 commercial)78,054 sq m (840,165 sq ft)54.9%
Roads42,212 sq m29.7%
Parks (four)14,871 sq m (~3.7 acres)10.5%
Civic amenity site (one)7,133 sq m (~1.8 acres)5.0%
Open land: roads, parks and CA64,216 sq m (15 acres 34.73 guntas)45.1%
Total142,270 sq m (35.16 acres)100%

Shares are rounded to one decimal place.

At 17.6 plots per acre, the density follows from the plot sizes: two-thirds of the plots are 30 x 40s of about 1,200 sq ft, a little over a fifth are 30 x 50s of about 1,500 sq ft, and the rest are odd-shaped plots where the grid meets the boundary. The plot options page sets out every size.

Assetz City of Palms Roads - The 15 m Spine and the Grid

The 15 m spine road is the main street of Assetz City of Palms. It meets Chapparakallu Road on the west side and runs east through the middle of the land to the east boundary, dividing the layout into northern and southern halves. From it, 12 m and 9 m roads run north–south in alternation. In most blocks two rows of plots sit back to back between a pair of roads, so every plot faces a road.

RoadWidthRole
Chapparakallu Road (existing)22 mWest frontage: 3.3 km north to the STRR, 2.3 km south to IVC Road
Spine road15 mEast–west through the middle, from the Chapparakallu Road side to the east boundary
Internal roads12 mNorth–south, alternating with the 9 m roads and flanking the green spine
Internal roads9 mNorth–south, serving the plot rows between the 12 m roads
Pedestrian pathways3 m and 1.2 mWalking links through the layout

Every internal road is concrete-finished, with paver footpaths along the driveways, avenue planting on both sides, timer-controlled LED streetlights, signage and plot numbering, and a paved access into each plot. Plots on the wider roads carry a Preferred Location Charge, and the spine road, as the main street, will carry the layout's through traffic.

Adjoining land and the layout's roads. The promoter intends a separate future project on adjoining land, and that project will take its access through the roads of Assetz City of Palms. Under the sanctioned plan these are public roads, to be handed over to the local authority, so no plot owner holds an exclusive right over them. The agreement describes the adjoining development as a separate project with its own approvals, amenities and clubhouse. Ask which roads its traffic will use before you settle on a plot along them.

Assetz City of Palms Parks and the Green Spine

Four parks, 14,871 sq m or about 3.7 acres, bring open green to both halves of the layout, along the frontage and through its centre.

ParkAreaWhere it sits
Park-1~1,250 sq mOn the frontage just south of the spine road, wrapping the clubhouse plot's north and west sides
Park-25,382 sq mThe largest: a long strip along the northern stretch of the frontage
Park-34,057 sq mNorth of the spine road, east of centre: the northern half of the green spine
Park-44,182 sq mSouth of the spine road to the south boundary, with the STP at its south end

The green spine is the signature of the plan. The natural drain that crosses the land from north to south is kept as a landscaped strip, Park-3 above the spine road and Park-4 below it, running the full depth of the layout with a 12 m road on either side, so the plots across those roads look onto green. Park-2 does the same on the west, setting the plots behind it back from Chapparakallu Road. The outdoor programme of lawns, courts, play areas and pathways is planned across the parks and open spaces, and the amenities page covers each one.

The Assetz City of Palms Clubhouse Plot and Civic Amenity Site

The clubhouse has a plot of its own. Plot 1, the layout's only commercial plot, gives it about 21,300 sq ft of land on the Chapparakallu Road side, with Park-1 to the north and west, the 12 m road along its east side, and Plot 2 and the civic amenity site to the south. The ~20,000 sq ft clubhouse, with its swimming pool and deck, is planned here; the amenities page walks through it.

The civic amenity site, 7,133 sq m or about 1.8 acres, takes the south-west corner of the frontage. It is reserved for civic use and relinquished with the roads and parks.

Clubhouse timing. The clubhouse is scheduled for 15 May 2030, fifteen months after the plots (15 February 2029), and its land stays with the promoter; residents use it through the Plot Owners' Association.

Underground Services at Assetz City of Palms

Power, water, sewage and data run underground at Assetz City of Palms and stop at the plot boundary, ready for each owner to connect when they build.

ServiceWhat is laid
WaterGram panchayat supply (the panchayat has agreed to supply the project); an overhead tank feeds underground lines to every plot entry
Treated waterA centralised underground sump holds treated water for the landscape, with drip irrigation across most common areas
SewageAn underground sanitary line from every plot entry to the 450 KLD STP
PowerUnderground lines from the transformer yard to feeder pillars, with provision for a cable to each plot
Backup100% DG backup for common utilities
DataUnderground conduits for fibre
Storm waterStorm-water drains, with rainwater recharge pits
WasteAn organic waste converter

The overhead tank is placed at the north end of Park-3 and the STP at the south end of Park-4, so the two ends of the green spine carry the water systems. Each service has a completion target: storm-water drains by 15 August 2028; internal roads, footpaths and lighting by 16 August 2028; water supply, sewerage, the STP, solid waste and rainwater harvesting by 15 November 2028; and the electrical meter room, substation and receiving station by 15 January 2029. Layout development is budgeted at ₹87.60 Cr of the registered ₹552.23 Cr project cost, and the works carry a five-year defect liability.

The Chapparakallu Road Frontage

Assetz City of Palms fronts Chapparakallu Road for about 0.44 km along its west boundary. The existing 22 m road runs 5.65 km almost dead straight from NH-648, the STRR, at Chapparakallu to Thindlu Circle on IVC Road. The layout sits 3.3 km south of the STRR and 2.3 km north of IVC Road, between the Kundana-hobli villages: Chinna Kempanahalli, Kundana and Doddacheemanahalli to the east, and Aluru Duddanahalli, Sulakunte and Dyavarahalli to the west.

No house plot opens onto the main road. The frontage is lined by Park-2, the spine road's junction, Park-1 with the clubhouse plot just behind it, and the civic amenity site. The plan also keeps a road-margin line 15 m from the road's centre line, about 30 m of reserved width against 22 m today; no widening scheme has been announced. An older approved residential layout adjoins to the north, with farmland and plantations to the east and south. Road distances to schools, hospitals, employment and the airport are on the location page.

BIAAPA-Approved Plots in Devanahalli - Assetz City of Palms Approvals

Assetz City of Palms is planned under BIAAPA, the Bengaluru International Airport Area Planning Authority, which approved its draft residential layout plan on 19 June 2026. The land was converted to residential use by orders of May and June 2025, the environmental clearance is not required for this layout, and the project was registered with K-RERA on 30 June 2026 under PRM/KA/RERA/1250/303/PR/300626/008780. Check it yourself at rera.karnataka.gov.in.

Possession follows the authority's release of the plots and is due by 15 February 2029, and the sale deed is registered within 60 days of the possession notice. As at 21 September 2026, the project is registered and under development; the overview page sets out the full status.

Assetz City of Palms Works Schedule

The works programme runs from 16 August 2026 to 15 February 2029, in overlapping stages.

WorksWindow
Plot formationAugust 2026 – August 2027
Roads, footpaths, drainage and electrical polesOctober 2026 – August 2028
Power supply: transformer and substationAugust – October 2028
PlantationMarch – November 2028
Other works and finishingThrough to February 2029
Layout complete and plots handed overBy 15 February 2029
Clubhouse completeBy 15 May 2030

Payments follow the works on the buyer's own cluster. After booking and the agreement, instalments fall due on plot levelling, the cross-road layer works, and the STP civil works and underground services in the plot's cluster, so 65% of the price (20% + 20% + 25%) is tied to progress on the ground, with a further 10% due at the call for registration. The price page sets out each stage.

Reading the Assetz City of Palms Masterplan as a Buyer

Four things on the plan shape the plot you choose:

  1. The road it faces. The 15 m spine road, a 12 m road or a 9 m road: the wider roads carry a Preferred Location Charge, and the spine road carries the most traffic.
  2. What lies across the road. Plots facing Parks 2, 3 and 4 look onto open green and carry a PLC; interior plots on the 9 m roads tend to be the quietest.
  3. Its place in the grid. Corner plots and the odd-shaped plots along the boundaries have their own geometry, and the STP sits at the south end of Park-4.
  4. Its cluster. Payments track the works in the plot's cluster, which sets the pace of your instalments.

Ask for the plot-by-plot availability grid, with road widths, facings and PLCs, through the contact page. The plot options page covers every size, and the gallery shows the plantation the layout is built on.

Enquire about Assetz City of Palms

Walk the plantation, stand on the Chapparakallu Road frontage and see where your plot sits. Leave your name and phone number, and the sales team will share current availability, the cost sheet and a slot for your visit.

Book a Site Visit

Assetz City of Palms Masterplan – Frequently Asked Questions

Is Assetz City of Palms BIAAPA approved?

Yes. BIAAPA, the Bengaluru International Airport Area Planning Authority, approved the draft residential layout plan on 19 June 2026, and the project was registered with K-RERA on 30 June 2026 under PRM/KA/RERA/1250/303/PR/300626/008780. Plot possession is due by 15 February 2029, after the authority's release of plots.

How much of Assetz City of Palms is open space?

About 45% of the land, 45.1% or 64,216 sq m, stays open: roads take 29.7%, the four parks 10.5% and the civic amenity site 5.0%. Plots take the remaining 54.9%.

How wide are the roads at Assetz City of Palms?

The spine road is 15 m wide, the internal roads 12 m and 9 m, and the pedestrian pathways 3 m and 1.2 m. Chapparakallu Road, on the west frontage, is 22 m wide today.

Will another project use the Assetz City of Palms roads?

Yes. A separate future project on adjoining land will take its access through this layout's roads, which are public roads under the sanctioned plan. Ask which roads that traffic will use before you choose a plot along them.

When will the Assetz City of Palms layout be complete?

By 15 February 2029, with possession of the plots. Plot formation runs to August 2027, roads and drainage to August 2028 and power works to October 2028, and the clubhouse follows by 15 May 2030.